OPT’s team is expert of delivering ocean cranes especially in huge cranes with ≥30 tons safety working load.
It is mainly installed on the bow deck of the hull, midship deck and stern deck, and is used for the transfer of hull instruments and equipment.
| |
SWL: 25 tons @ 30m | SWL: 50tons @ 30m |
|
|
SWL: 100 tons @ 40m | SWL: 75 tons @ 30m |